{"product_id":"mpt-planning-and-field-setup-toolkit","title":"MPT Planning and Field Setup Toolkit","description":"\u003cp\u003e\u003cstrong\u003eOrganize MPT and temporary traffic-control work from project intake through closeout.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThis eight-page planning and field toolkit covers the information, approvals, people, equipment, hold points, inspections, stop-work triggers, change control, and daily records needed to prepare a safe operation.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003eEditable Word file\u003c\/li\u003e\n\u003cli\u003ePrint-ready PDF\u003c\/li\u003e\n\u003cli\u003eProject intake and approval checklist\u003c\/li\u003e\n\u003cli\u003ePlan-package completeness review\u003c\/li\u003e\n\u003cli\u003ePeople, vehicle, and device readiness checks\u003c\/li\u003e\n\u003cli\u003ePre-shift briefing and installation hold points\u003c\/li\u003e\n\u003cli\u003eActive-work-zone inspection form\u003c\/li\u003e\n\u003cli\u003eStop-work, removal, and closeout process\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eImportant:\u003c\/strong\u003e This is not a traffic control plan, engineering design, permit, training credential, or authorization to close a facility. A qualified person must select or design the site-specific application, and the approved project documents always control.\u003c\/p\u003e\n\u003cp\u003eReferences include the current FHWA MUTCD resource and Pennsylvania temporary traffic-control resources. Confirm the current adopted requirements before each use.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eDigital product. No physical item is shipped.\u003c\/em\u003e\u003c\/p\u003e","brand":"Solid Ground Digital Co.","offers":[{"title":"Digital Download","offer_id":49379914973323,"sku":"FL-MPT-SETUP","price":59.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0766\/9828\/8267\/files\/solid-ground-mpt-planning-field-setup-toolkit.png?v=1790051562","url":"https:\/\/solidgrounddigitalco.com\/products\/mpt-planning-and-field-setup-toolkit","provider":"Solid Ground Digital Co.","version":"1.0","type":"link"}